T10's arrived Friday and Saturday - assembled bottom, front, and sides on all 3 yesterday and allowing the sealant to dry a couple 2 - 3 days. I'm quite impressed with the engineering and fabrication of these enclosures. They seem to be well built for being light weight and the attention to detail is nice.
Unfortunately, 1 of the tops was damaged by FedEx - corner of the box was ripped open and the top corner was broken (of course it's the top with 2 RHP's). I've got a message in to Ali and we'll see what happens. I do hope FedEx is help responsible and AP doesn't have to absorb the cost.
I've also got the majority of my stand built as I'm just waiting for the casters to arrive. Sauzo, I decided to go with the 1" black pipe and 2" x 6" - I'm sure it'll hold without incident after a little testing I did while building it, it's pretty stout.
I'll post pictures when everything is up and installed.