Just to add to the Acu-Rite suggestion, get some velcro tape at the same time as the unit has to be mounted inside of the tank on either the cool or warm side, then the probe is to be run to the opposite. I have read that you should mount the probe near the substrate and the unit five or so inches above the substrate.