the new one will be started in the next 2 - 4 weeks, ive got to get the old one down, as this will replace it, and then ive got to have the base dug out, and the damp course put in, and also have the floor filled with contrete, althought afterwards a wooden frame will go on the floor and i will have a 15mm ply floor, with industrial carpet on it, i just think concrete feels cold, and i want the palce to have a nice warm feel to it lol
im toying with the idea of putting a bed in the storage room and stopping in there every now and then lol!
i think i need a TV, and a sofa and ill be sorted
ill get collection pics, current racks and vivs, aswell as w.i.p pics of the old one coming down, and the new one going up lol