Quote Originally Posted by bcr229 View Post
Probably material cost. The 4-level may be do-able with one 4x8 sheet of PVC but the 5-level requires two sheets. Yes some of the second sheet would be available for another build - if he had orders in the hopper.
Oh, that makes sense- I was thinking that might have been a possibility, thanks!