This will probably be my last update for a while as I don't plan on changing much for now on. I added a shield for the plumbing under the sink.
Got a cage for the sugar gliders and will be putting them out here, as they tend to smell also.
fan, makes a big difference, glad I listened to Freakie_frog
I currently have my pot fan turning on for 5 minutes every 2 hours. I might have to increase that as I start getting more rodents in there. I still need to do the tubing on 2 of the racks, but I hate the home depot tubing I got, so I am waiting on the tubing I ordered previously. When the guy comes to do check out on the air conditioning, I will be having him move the ductwork up along the ceiling. The original plan was to do it that way so nothing would block the return, but due to the dust I changed my mind and put the return on the outside of the room (not so much a return as it is an intake now). however I never thought ahead about changing the duct work. I still need to build drawers for the sink, but I have more pressing projects around the house, so that will have to wait. Prehaps in a few months I could do an update to see how its working out for me. but so far everything is going great.
![]()