Quote Originally Posted by Elusive Dream View Post
The joint compound was not cured. How long did you wait before sanding the joints and painting?

You can try and run a dehumidifier and get it down to 35% for a week or so and then try and repaint. It will dry out even after being painted but takes a while. I would recommend a good fan on each wall or just point one at a wall, move it after 8 hours or so and just keeping repeating for a week.
Well, I worked my way around the room over a 2 week period, so some walls were dried for longer than others. The one wall was dry for over a week for sure though.

Will it get worse and worse? or at some point will the yellowing stop. I don't want to repaint if its going to just come back.