Too me it seems everything goes really quick but installing the screen takes forever.
Yup, working with a big roll of galvanized hardware cloth SUCKS. I probably could have built it a lot faster if I had more room to work. I had to do all the cuts outside then assemble everything inside my 9 by 13 foot snake room that's already full of racks. Lol.
Kevin Johnson
0.2 Normal BP -- 0.1 Pastel BP -- 0.1 Spider BP -- 0.1 Het Red Axanthic BP -- 0.1 Ghost dinker
2.1 Het Pied BP
1.0 Lesser Bee BP -- 1.0 Pastel Yellowbelly BP -- 1.0 Mojave BP -- 1.0 Black Pastel BP -- 1.0 Cinny (poss het ghost) -- 1.0 Champagne