about an inch or so down from the top lip of the tub, start with maybe 4-5 on each side leaving the front and back alone, and add holes as needed until your humidity is good.
The larger the tub the more holes you will need, but always start with fewer and work your way up.
Last edited by snakesRkewl; 11-15-2011 at 01:11 PM.