The cage body is finished!
I designed the roof to be removable (2 man job) so underneath it is a set of guides to help provide a snug fit.
Roof base and frame completed.
Cement board installed. Then the roof fit was tested.
Tiling the roof. I used left over granite tiles (hence the 2 man lift) that will provide a strong table top like surface. I cut them all into different shapes and fit it together like a jigsaw.
Roof top finished. The frame needs painting, but thats tomorrows job.
The cage was painted while the work on the roof continued. The rabbit seems to like the large open running space and tomorrow there will be a roof above her head![]()