Well it's not done yet, but it has come a long way. We are definitely over budget, but it looks like it will be done on time. My scheduled complete date was Feb. 28. For those of you who have been waiting for an update, here it is.
First pic is the new door.


This is the wall with the window. This is where the A/C will go. In my last two construction projects, I just made a hole in the wall for the window unit. Well, when your unit craps out, and you have to replace it, if you have to get a different model, it never fits. So this time, I said I would do it right.


This is the long wall. Most probably it will be filled from one end to the other with racks.


This wall is opposite the window, andwill probably be insulated and walled up last.


This is the second long wall. It will probably have a bunch of racks and plenty of bags of rodent chow. It does have some insulation already installed. It is next in line for plywood.


By the way, all of these walls will eventually be covered with what I call shower board. It will be glued onto the plywood walls. Makes for easy clean up of urine from bad aiming rats.

This last picture is of the two vent fans that we installed into the ceiling. They are independantly operated, so that if only one is needed, say the day after cleaning, the other can be turned off.


Hopefully in about three weeks I will have some more pics of a nearly complete room. And of course, we'll put up pics after the room is done and inhabited. Hope you enjoy the pics. If anyone has any questions, please feel free to ask.