Vote for BP.Net for the 2013 Forum of the Year! Click here for more info.

» Site Navigation

» Home
 > FAQ

» Online Users: 820

2 members and 818 guests
Most users ever online was 9,191, 03-09-2025 at 12:17 PM.

» Today's Birthdays

None

» Stats

Members: 75,876
Threads: 249,071
Posts: 2,571,983
Top Poster: JLC (31,651)
Welcome to our newest member, TreySongz
Results 1 to 10 of 28

Threaded View

  1. #1
    BPnet Senior Member CD CONSTRICTORS's Avatar
    Join Date
    07-14-2012
    Location
    Daytona Beach, FL
    Posts
    1,831
    Thanks
    739
    Thanked 1,163 Times in 658 Posts

    60 tub V-18 build started..... progression thread

    Having built 5- 6 XPVC racks and an incubator, I was looking to improve the rack builds by recessing the heat tape. I'm tired of taping the edges of the heat tape down and having the tubs always slide over the heat tape. Talking to Reptile Basics they recommended to recess a slot in the shelf for the heat tape and using their double sided tape to secure the heat tape in place.

    I dropped off some excess pieces of XPVC to Piedmont today and bought 2 sheets of XPVC to have them cut me 21 pieces at 19" x 22.27" for my 3 wide, 20 tall V18 build. Then I went to Harbor Freight a bought a $60 1.5 HP plunge router with a 20% off coupon and a 3/4" flush router bit. I had some scraps still laying around and decided to route the channel in some scrap for 3" heat tape.

    Here we go:

    1.5 HP Plunge router:


    Came with an edge guide:


    5 minutes of work:


    Now... doing 20 pieces will take an hour or so, but I think the time and money will be well spent.

    Stay tuned for the build

  2. The Following 4 Users Say Thank You to CD CONSTRICTORS For This Useful Post:

    AlexisFitzy (03-03-2015),BumbleB (02-26-2015),Eric Alan (02-26-2015),Tsanford (02-26-2015)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Powered by vBadvanced CMPS v4.2.1