Vote for BP.Net for the 2013 Forum of the Year! Click here for more info.

» Site Navigation

» Home
 > FAQ

» Online Users: 3,388

4 members and 3,384 guests
Most users ever online was 6,337, 01-24-2020 at 04:30 AM.

» Today's Birthdays

None

» Stats

Members: 75,097
Threads: 248,540
Posts: 2,568,747
Top Poster: JLC (31,651)
Welcome to our newest member, Travism91
Results 1 to 10 of 28

Thread: DIY Large Rack

Threaded View

  1. #1
    BPnet Veteran lord jackel's Avatar
    Join Date
    06-09-2006
    Location
    Not sure anymore
    Posts
    2,239
    Thanks
    7
    Thanked 57 Times in 19 Posts
    Images: 9

    DIY Large Rack

    After I posted pictures of my rack I had several people ask me to write up a DIY on how I built it. So this is my attempt at just that, let me say this is the first time I have attempted to write one of these so if I am not clear or missed a step please let me know and I will fix it.



    Materials:

    (6) 2' X 4' X 8' (total rack)

    (3) 2' X 2' X 8' (per level)

    (1) 2' X 3' X 8' (per level) - note the HD and Lowes near me don't carry 2X3's so I had to use 2X4s but 2X3s are all that are needed

    (1) 4' X 8' (per 2 levels) tile board (like used in a bathroom) This is basically thin MDF with a waterproof while vinyl coating (in HD it is found between the wood and bathroom dept)



    If you want the hatchling rack portion then you also need another tile board and a 1/2" X 4' X 8' MDF board



    For heat (3 tubs across):

    I used metal wall studs - these are like 2X4's they are used as wall studs (but they have only 3 sides...see image)

    About 5' of Flexwatt and Refletix per level + aluminum tape to hold it together.

    Thermostat of Choice (Herpstat or Helix are best)



    Tools:

    Table Saw with a Dado blade (a Dado blade is basically 2 normal table saw blades with cutting spacers between then that allows you to cut grooves - you find them wherever they sell table saw blades. Using this method it only takes about 10 mins to cut all the tub grooves. Alternatively you could use a router but it will take hours as you cannot cut deep enough with one pass.

    Chop Saw

    Cordless Drill and a lot of 2.5" woodscrews

    Hammer and finishing nails (I used a brad nailer which is much easier but not everyone has one of these)



    Finally you need your choice of tubs. I used 31QT Rubbermaid tubs (but this design is easy to "grow" to 41QT tubs as your snakes sizes dictate.



    Getting started:

    1. Measure the length of the tubs you are using (front to back of where the lid sits).

    2. Cut the 2X2's you need 2 pieces cut to what you measured and 2 more cut 3" longer for each level (NOTE you will need 2 more of these longer ones later on for the base).

    3. Cut the 2X3s to the same length as the +3" 2X2s, you will need 2 for each level.

    At this point I cut all the wood I needed for each level (of these parts).



    Time to cut the grooves:

    5. Set up the Dado blade (according to its instructions) you want it 1/8" larger then the thickness of the tub edge (for Rubbermaid this = 1/2").

    6. Cut one corner of the longer 2X2's (they will look like L's then cut both corners of all the 2X3's to make a "T" (see images).

    You now have all the rails for the tubs.



    These next steps are tough to explain and I didn't take pictures during the building process so bear with me.

    7. Lay one of the grooved 2X2 on the ground groove up,

    8. Place one edge of a tub (tubs will be upside down) in the groove then a grooved 2X3 under the other edge, then a tub in the opposite side groove then another 2X3, tub and finally a grooved 2X2.

    So you will have 2X2 - tub - 2X3 - tub - 2X3 - tub - 2X2. This will stretch out about 5' long.

    9. Measure from the outside to outside of the 2X2. Cut another 2X2 to this measurement, again about 5'.



    Make the levels:

    10. Connect the long 2X2's (cut in last step) to the non-grooved 2X2's (the smaller ones on the inside) with 2.5" woodscrews to create a square frame.

    11. Measure the outside of this frame and cut the tile board to fit.

    To put the level together you want to sandwich the tile board between the frame and the rails.

    12. Place the frame on a flat hard surface and attach the tile board to it (use the finishing nails) with the waterproof side up

    13. Attach one of the grooved 2X2 to the frame (from step 8) - If looking at the left side the 2X2 will look like a backwards 7

    14. Place one of one of tubs under this 2X2 - then place a 2X3 at the other tub edge (will look like a T), repeat with another 2X3, tub and finally a 2X2 at the other edge. If you measured correctly in step 9 the 2X2s will land on each edge perfectly. Screw all this down with woodscrews to the frame (through the tile board)

    I recommend predrilling the screw holes so as to not split the tile board.

    At this point you should be able to turn the frame over and the tubs will remain suspended and slide in and out.

    15. Repeat steps 10-14 for each level



    As this is unwieldy for a single post I am going to stop it here and “put it all together” and the “hatchling” and “heat” portions in a separate post.
    Sean

  2. The Following 3 Users Say Thank You to lord jackel For This Useful Post:

    BFT12890 (11-06-2011),Driver (08-18-2011),SGExotics (12-22-2009)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Powered by vBadvanced CMPS v4.2.1