Hello all I built my BP cinder a hide boxs from some scrap wood that my wifes grandpa had laying aroung. I painted it green and them polyurothaned the entire box and have heard that there is a time frame for which it has to airdry and so that the vapors would go away. I was wondering on how long that time period is. Its been about a week since I built it. Thanks