Well It looks like we are going to start work at the end of january to finish the reptile building. We are going to double insulate it and drywall it. And install a drop down ceiling becuase the heating and air guy said it would lower our heating costs. and Im going to have carolina heating an air install central heating and air. And also im going to have to find a plumber to install a large utility sink because I have no clue whatsoever on how to even begin doing that. Im hoping to have all of it finished no latter then may 2010. We are very excited about finally getting ready to start on it. I love my snakes to DEATH! But I can not WAIT to get them out of the house lol. Ill have so much room to work with the big guys and this way way when im in the building I can actually let them out of there cage and they can roam around a bit while I clean instead of being stuffed in rubbermaid containers. And sarah will be so pleased when I stop using her kitchen sink to clean waterbowls and tubs lol