I haven't personally but the home-builds I've seen usually involve a commercial heavy-duty shelving unit. The heat is installed on the back and rear section of the side walls as the tubs and snakes they contain are heavy enough that you don't want to risk them tearing up tape installed for belly heat.
There are a few commercially available racks for the VE-175 tubs but they are $$$$$.