Vote for BP.Net for the 2013 Forum of the Year! Click here for more info.

» Site Navigation

» Home
 > FAQ

» Online Users: 626

2 members and 624 guests
Most users ever online was 47,180, 07-16-2025 at 05:30 PM.

» Today's Birthdays

None

» Stats

Members: 75,916
Threads: 249,118
Posts: 2,572,201
Top Poster: JLC (31,651)
Welcome to our newest member, Wilson1885
Results 1 to 5 of 5
  1. #1
    Registered User
    Join Date
    07-13-2013
    Posts
    41
    Thanks
    7
    Thanked 14 Times in 12 Posts

    Heat tape wiring question...

    I am in the process of building my 1st Melamine rack and I has a small heat tape question. I have seen 2 types of wiring setups that have interested me. One is the standard continuous strip of tape wired at the top and threaded through the rack. The one that I am questioning is a setup I saw last night. The build was done using 11" tape seated front to back. All the pices were connected with wire at the back of the bin. Instead of having to thread the tape through the rack, you merely had to connect them with a small section of wire I hope my poor description is clear. I am wondering if this is an efficient method of connecting tape and is it safe?

  2. #2
    BPnet Senior Member Robyn@SYR's Avatar
    Join Date
    09-09-2009
    Location
    Denver, CO
    Posts
    1,525
    Thanks
    200
    Thanked 956 Times in 385 Posts
    I prefer separate pieces per level. You can either wire them separately, and use a power strip to tie everything together, or wire them in parallel.

    Some folks also set up heat tape for back heating. I am not sure that is what you describing.

    My least favorite choice is one long piece S-wired through the shelving. I think that gives the most uneven heating result.

  3. #3
    Sometimes It Hurts... PitOnTheProwl's Avatar
    Join Date
    11-21-2010
    Location
    San Antonio, TX
    Posts
    12,050
    Thanks
    6,313
    Thanked 6,985 Times in 4,274 Posts
    Images: 3


    Sorry its the only pic I have in my photobucket at the moment but yes it works great, all soldered.
    Top to bottom and the plug coming off of the bottom shelf.

  4. #4
    BPnet Veteran scooter11's Avatar
    Join Date
    10-26-2012
    Location
    melrose, ma
    Posts
    492
    Thanks
    58
    Thanked 195 Times in 120 Posts
    I have multiple racks I built and I have used all three methods. The most simple way of doing it is one long piece. The negative being that it costs a lot more in heat tape. I like the least amount of wire leaving the rack as possible. So for me the method using a full wire and plug with each piece is out. The method I prefer is to wire a piece for each level together to make a long strand of connected pieces. This is what I use for my racks that hold larger cages, 28-41 quarts. This is much more of a pita in my opinion. Its a lot more work, but It works better for my purposes on larger racks. The racks I've built for babies and grow outs I employ one long strip.

    Sent from my EVO using Tapatalk
    Last edited by scooter11; 12-10-2013 at 03:03 PM.

  5. #5
    Registered User killswitch's Avatar
    Join Date
    11-20-2013
    Posts
    95
    Thanks
    8
    Thanked 38 Times in 29 Posts
    I don't remember where I pulled this image from but I hope it helps. This is the method I am currently using.
    0.2 Piebald
    0.1 Mojave
    0.1 Pastel
    0.1 Butter Pastel
    0.1 Granite lemon blast (granite, pastel, pinstripe)
    1.0 Bumblebee (pastel spider) Het piebald 50% het caramel
    1.0 X-treme gene Butter
    1.0 Pastel
    1.0 Piebald
    2.1 German Shepherds
    Pics of most can be found here

    http://www.iherp.com/killswitch

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Powered by vBadvanced CMPS v4.2.1