Been spending the better part of this year trying to find free time to work on refinishing a woodshop in my basement into the new reptile room. It doesn't look like much but it was a crapload of work to gut everything out and then frame things back in and get the electrical done. I'm really happy with the results so far and I've set a deadline date of the 4th of July for being all moved in (same date as when my first clutch is anticipated to hatch )
Enjoy and thanks for looking!
360 degree walk around:
Closet incubator:
Have to install the insulated door yet but the bathroom light/fan is mounted and wired!
Next up is mounting the door, insulation, then dry wall. After that; drop ceiling, new can lighting, bathroom fan for the main room (to circulate air out), utility sink, paint, and moulding. Still alot to do.....and the clock's ticking. But I'm excited to see things start to come together!